• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
March 13,2025

CERC: Petition for adoption of transmission charges to Transmission System of Bikaner B Power Transmission Limited

Application under Section 63 of the Electricity Act, 2003 for the adoption of transmission charges with respect to the Transmission System being established by the Bikaner B Power Transmission Limited (a 100% wholly owned subsidiary of Power Grid Corporation of India Limited). 

Bikaner B Power Transmission Limited,

Versus

Central Transmission Utility of India Limited, REC Power Development and Consultancy Limited & 39 others

Background:

The Petitioner, Bikaner B Power Transmission Limited (hereinafter referred to as “Petitioner”), has filed the present Petition under Section 63 of the Electricity Act, 2003 (hereinafter referred to as “the Act”) to establish the Transmission system for evacuation of power from Rajasthan REZ Ph-IV (Part-3: 6 GW) [Bikaner complex]: Part B” on a Build, Own, Operate and Transfer Basis.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related