Background
The instant Petition has been filed by Power Grid Corporation of India Limited for truing up of the transmission tariff for the 2019-24 period under the Central Electricity
Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 (hereinafter referred to as “the 2019 Tariff Regulations”) and for the determination of transmission tariff for the 2024-29 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 (hereinafter referred to as “the 2024 Tariff Regulations”) in respect of Tuticorin JV-Madurai 400 kV D/C (Quad Conductor) Line and extension of 400/220 kV Madurai Sub-station (hereinafter referred to as “the transmission asset”) under ATS of Tuticorin JV TPS (hereinafter referred to as “the transmission project”) in the Southern Region:
The Petitioner has made the following prayers in this Petition:
“a) Approve the trued-up Transmission Tariff for 2019-24 block and transmission tariff for 2024-29 block for the assets covered under this petition, as per para 12 and 13 above.
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.