• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
December 03,2024

CERC: Petition for Determination of tariff on installation of various ECS at NCTPS, Dadri Stage-II (980MW)

NTPC Limited, NTPC Bhawan, Core-7, Scope Complex, 7, Institutional Area, Lodhi Road, New Delhi-110 003

Versus

Uttar Pradesh Power Corporation Limited, Tata Power Delhi Distribution Limited, BSES Rajdhani Power Limited, BSES Yamuna Power Limited, 

Background: The Petitioner, NTPC Limited, has filed this Petition for the determination of tariff on the installation of the various Emission Control Systems (ECS) at the National Capital Thermal Power Station (NCTPS), Dadri Stage-II (980 MW) (in short, “the generating station”) in compliance with the Revised Emission Standards.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related