Power Grid Corporation of India Limited,
Versus
Madhya Pradesh Power Management Company Limited, Maharashtra State Electricity Distribution Company Limited, & Gujarat Urja Vikas Nigam Limited
Background:
The instant Petition has been filed by Power Grid Corporation of India Limited
(PGCIL) for truing-up of the transmission tariff for the 2019-24 tariff period under the
Central Electricity Regulatory Commission (Terms and Conditions of Tariff)
Regulations, 2019 (hereinafter referred to as “the 2019 Tariff Regulations”) and for the
determination of transmission tariff for the 2024-29 tariff period under the Central
Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024
(hereinafter referred to as “the 2024 Tariff Regulations”) in respect of the Combined
Assets comprising of Asset-A1 : 765 kV Line bay & 3x80 MVAR line reactor at 765
kV Vadodara GIS for Vadodara-Dhule transmission line (IPTC) and Asset-B1 : 765 kV
line Bays & 3*80 MVAR Switchable line Reactor at 765 kV Jabalpur Pooling Substation
(for 765 kV S/C Jabalpur-Bhopal line), Asset-B2: 765 kV Line BAYS & 3*80 MVAR
line reactor at 765 kV Indore S/S (for 765 kV S/C Bhopal-Indore line) and Asset-B3: Extension of 765 kV Aurangabad Sub-station for 765 kV S/C line bay (hereinafter
referred to as the “Combined Assets”) under “Line bays and Reactor Provisions at
POWERGRID Sub-stations associated with System Strengthening (hereinafter
referred to as the “transmission project”) in the Western Region”.
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.