CERC: Petition for determination of transmission tariff for the 2024-29; Vadodara GIS for Vadodara-Dhule TL, PGCIL

Power Grid Corporation of India Limited,

Versus

Madhya Pradesh Power Management Company Limited, Maharashtra State Electricity Distribution Company Limited,  & Gujarat Urja Vikas Nigam Limited

Background: 


The instant Petition has been filed by Power Grid Corporation of India Limited (PGCIL) for truing-up of the transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 (hereinafter referred to as “the 2019 Tariff Regulations”) and for the determination of transmission tariff for the 2024-29 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 (hereinafter referred to as “the 2024 Tariff Regulations”) in respect of the Combined Assets comprising of Asset-A1 : 765 kV Line bay & 3x80 MVAR line reactor at 765 kV Vadodara GIS for Vadodara-Dhule transmission line (IPTC) and Asset-B1 : 765 kV line Bays & 3*80 MVAR Switchable line Reactor at 765 kV Jabalpur Pooling Substation (for 765 kV S/C Jabalpur-Bhopal line), Asset-B2: 765 kV Line BAYS & 3*80 MVAR line reactor at 765 kV Indore S/S (for 765 kV S/C Bhopal-Indore line) and Asset-B3:  Extension of 765 kV Aurangabad Sub-station for 765 kV S/C line bay (hereinafter referred to as the “Combined Assets”) under “Line bays and Reactor Provisions at POWERGRID Sub-stations associated with System Strengthening (hereinafter referred to as the “transmission project”) in the Western Region”.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related