• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
December 18,2024

CERC: Petition for Truing & Determining Transmission Tariff of Combined Asset period of 2019-24

Power Grid Corporation of India Limited

Versus

Tamil Nadu Generation and Distribution Corporation Limited (TAGEDCO), Kerala State Electricity Board Limited (KSEBL) & 14 others.

Background

The instant Petition has been filed by Power Grid Corporation of India Limited for truing up of the transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 (hereinafter referred to as “the 2019 Tariff Regulations”) and for the determination of transmission tariff for the 2024-29 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 (hereinafter referred to as “the 2024 Tariff Regulations”) in respect of the Combined Asset comprising Asset-1: 80 MVAR bus reactor along with Nellore 400 kV bay extension; Asset-2: 315 MVA ICT with Cuddapah 400 kV bay extension; Asset-3: 315 MVA ICT with Gooty Extension and IInd 3X167 MVA auto transformer at Kolar and switching arrangement for reactor at Somanahalli; Asset-4: 315 MVA ICT with Gazuwaka Sub-station bay extension; Asset-5: 315 MVA ICT with Munirabad Sub-station bay extension and Asset 6: 315 MVA ICT with Khammam Sub-station bay extension (hereinafter referred to as “the Combined Asset”) under System Strengthening Scheme-V in Southern Region.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related