August 04,2022

CERC: Review of Commission’s order dated 31.1.2022 in Petition No. 401/GT/2020 in respect of truing-up of tariff of Vindhyachal Super Thermal Power Station Stage-I (1260 MW) for the period from 1.4.2019 to 31.3.2024

Petition No. 401/GT/2020 was filed by the NTPC Limited (hereinafter referred to as ‘the Review Petitioner’) for determination of tariff of Vindhyachal Super Thermal Power Station Stage- I (1200 MW) (in short’ the generating station’) for the 2019-24 tariff period in terms of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 (hereinafter referred as “the 2019 Tariff Regulations”) and the Commission by order dated 31.