Review Petitioner: Power Grid Corporation of India Limited,
“Saudamini”, Plot No. 2, Sector 29,
Gurgaon-122001, Haryana
Background:
The Commission, in its order dated 24.2.2023 in Petition No. 6/TT/2020
(impugned order), determined the transmission tariff with respect to the following four
transmission assets of the Review Petitioner for the 2014-19 tariff period as per the
Central Electricity Regulatory Commission (Terms and Conditions of Tariff)
Regulations, 2014 (hereinafter referred to as the ‘2014 Tariff Regulations’):
- Asset 1: 1 No.
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.