CERC RoPs: Petition for determination of tariff of Khurja Super Thermal Power Plant and Dedicated Transmission Line

Petition for determination of tariff of Khurja Super Thermal Power Plant (2x660 MW) for the period from COD of Unit-I i.e 26.1.2025 to 31.3.2029 and for Dedicated Transmission Line from Khurja STPP (2x660MW) to Aligarh Substation from Commercial Operation Date i.e. 26.1.2025 till 31.3.2029. 

THDC India Limited

Versus

UPPCL and 4 others

Record of Proceedings 

During the hearing, the learned counsel for the Petitioner prayed that the Commission may consider the grant of an interim tariff of Unit-I of the generating station, from the date of its commercial operation, subject to adjustment based on the determination of the final tariff.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related