Petition under Section 79 including Section 79 (1)(c) of the Electricity Act, 2003, read with Regulations 5.8(vii) and Regulations 11A and 11B read with regulations 41 and 42 of Central Electricity Regulatory Commission (Connectivity and General Network Access to the Inter-State Transmission System) Regulations, 2022, thereby seeking relaxation of application of timeline provided under regulation 11A(1), by allowing the Petitioner to submit the registered title deed of the land required for the capacity for which connectivity has been granted, within 12 months from the date of grant of final connectivity, instead of within 18 months from the grant of in-principle connectivity (i.