• Infographics
  • Check Pricing
  • Newsletter
  • Login
August 07,2024

Truing up of transmission tariff for the 2014-19 period and determination of transmission tariff for the 2019-24 period

Petitioner: Power Grid Corporation of India Limited, “Saudamini”, Plot No-2, Sector-29, Gurgaon-122001 (Haryana)

Background:

The instant Petition has been filed by Power Grid Corporation of India Limited for truing up of the transmission tariff for the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 (hereinafter referred to as the ‘2014 Tariff Regulations’) and determination of the transmission tariff under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 (hereinafter referred to as the ‘2019 Tariff Regulations’) for the 2019-24 tariff period in respect of the asset +/-200 MVAR STATCOM at 400/220 kV Nalagarh Sub-station (hereinafter referred to as the ‘transmission asset’) under ‘Provision of STATCOM at Nalagarh and Lucknow in Northern Region’ (hereinafter referred to as the ‘transmission project’).

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related