• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
January 10,2025

CMPDI releases tender for Design, Supply, Const. , Installation and Commissioning of grid connected Solar plant of 70 MW

Description of Work: Design, Engineering, Procurement & Supply, Construction, Fabrication, & Erection, Installation, Testing & Commissioning of grid connected ground mounted solar power plant of aggregate capacity of 70 MW (AC) with minimum 40 percentage DC overload capacity, at Nandan Washery, Kanhan Area, WCL consisting of all Civil, Structural, and Electrical Works and all other accessories and facilities required to make it complete in all respects including Power Evacuation, Connectivity approvals and Comprehensive Operation & Maintenance of plant for ten years.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related