• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
November 02,2026

CSERC: Petition of Ultratech Cement Ltd v/s CSPTCL for Enhancement of Power Drawl Load up to 80 MW at Rawan Cement Plant

Petitioner: M/s Ultratech Cement Limited

Versus

Chhattisgarh State Power Transmission Company Limited & Chhattisgarh State Power Distribution Company Limited

Background: Petition under Sections 50 and 86(1)(c),(e), (h)and (k) of the Electricity Act, 2003 read with the Chhattisgarh State Electricity Supply Code, 2011 (as amended) and the Chhattisgarh State Electricity Grid Code, 2011, seeking approval of the Commission for enhancement of power drawl load up to 80 MW through existing dedicated transmission line connection qua UTCL’s Rawan Cement Plant connected through the dedicated 132 kV Suhela- Rawan transmission line from CSPTCL’s 220/132kV Suhela Sub-station.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related