GERC: Petition of Imandra Solar Pvt Ltd v/s GETCO for time period extension for commissioning evacuation infrastructure

Petitioner: Imandra Solar Private Limited

Versus

Gujarat Energy Transmission Corporation Ltd.

Background: Petition under Section 86 (1) (c) (e) and (f) of the Electricity Act, 2003 read with Regulations 80 and 82 of the GERC (Conduct of Business) Regulations, 2004 seeking directions for extension of time period for commission the entire evacuation infrastructure due to unforeseen and uncontrollable events.