Petitioner: M/s. OP Wind Energy Pvt. Ltd.
Versus
Gujarat Energy Transmission Corporation Ltd.
Background: Petition under Section 86 (1) ( c) ,(e ) and (f) and other applicable provisions of the Electricity Act, 2003 read with Regulations 80 and 82 of the GERC (Conduct of Business) Regulations, 2004 seeking extension of time period for construction of the evacuation infrastructure till 31.