The Karnataka Renewable Energy Development Limited (KREDL) has issued a Request for Selection (RfS) for the development of a 250 MW Solar PV Power Project integrated with a 250 MW/1100 MWh Battery Energy Storage System (BESS) at Ryapte, within the Pavagada Solar Park, Karnataka. This project is aimed at supplying peak power and optimizing grid utilization under a Tariff-Based Competitive Bidding process on a Build-Own-Operate (BOO) basis.
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.