• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
June 25,2025

MERC: Petition of UTCL v/s MSETCL for hybrid project connectivity that allows higher quantum of 2 installed capacities

Petitioner: UltraTech Cement Limited (UTCL)

Versus

Maharashtra State Electricity Transmission Co. Ltd. (MSETCL)/ STU, Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) & Maharashtra Energy Development Agency (MEDA)

Background: Petitioner has filed this Petition on 8 August 2024 under Section 86(1)(c), (e), (k) and Section 181 of the Electricity Act (EA), 2003, read with Regulation 39 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, along with Regulations 32 and 33 of the MERC (Transmission Open Access) Regulations 2016 (TOA Regulations 2016), as well as Regulation 100 of the Maharashtra Electricity Grid Code Regulations 2020 (MEGC Regulations 2020) and Regulations 36 and 37 of the MERC (Distribution Open Access) Regulations 2016 (DOA Regulations) 2016).

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related