• Infographics
  • Check Pricing
  • Newsletter
  • Login
October 30,2024

NTPC REL Invites Bids for RE Power Generators for Supply of 1200 MW Firm and Dispatchable Power from ISTS-Connected RE

Selection of RE Power Generators for Supply of 1200 MW Firm and Dispatchable Power (Assured Peak Power Supply) From ISTS-Connected Renewable Energy (RE) Power Projects Anywhere in India on Built-Own-Operate Basis (FDRE-02)

NTPC Ltd. invites online bids from eligible bidders on Single Stage Two Envelope (i.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related