RoPs: Petition for determination of transmission tariff from COD to 31.3.2024 for replacement at 400/220 kV Ludhiana SS

Power Grid Corporation of India Limited (PGCIL) Versus Ajmer Vidyut Vitran Nigam Limited and others.

Record of Proceedings:

The Petitioner’s representative submitted that the present Petition had been filed to determine the transmission tariff from the COD to 31.3.2024 for the replacement of the 1x315 MVA, 400/220 kV ICT (ICT-1) at the 400/220 kV Ludhiana (PG) substation with 1x500 MVA, 400/220 kV ICT.