RoPs: Petition for Seeking reliefs(s) against the CTUIL in connection with the 160 MW Connectivity at Koppal, Karnataka

Halvad Renewables Private Limited (HRPL) Versus Central Transmission Utility of India Limited (CTUIL)

Record of Proceedings

At the outset, learned counsel for the Petitioner pointed out that the Respondent, CTUIL filed its reply belatedly only on 3.10.2024 and accordingly, the Petitioner be permitted to file rejoinder within three weeks therefrom as originally permitted by the Commission vide Record of Proceedings for the hearing dated 28.