• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
March 31,2025

CERC: Petition for determination of the transmission tariff for the 2024-29 SCADA/EMS System at SLDC’s of NR

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for Asset-I: New EMS/SCADA at SLDCs of UPPTCL, RRVPNL, DTL, HVPNL, BBMB, PSPTCL, HPSEBL and J&K PDD, Asset-II: New EMS/SCADA at SLDCs of UPPTCL and J&K PDD under “Expansion and Replacement of existing SCADA/EMS System at SLDC’s of the Northern Region (NRULDC Phase-II)” 

Power Grid Corporation of India Limited,

Versus

Uttar Pradesh Power Corporation Limited, Ajmer Vidyut Vitran Nigam Limited,  Jaipur Vidyut Vitran Nigam Limited & 12 Others

Background:

The instant Petition has been filed by Power Grid Corporation of India Limited (PGCIL) for truing-up of the transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 (hereinafter referred to as “the 2019 Tariff Regulations”) and for the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 (hereinafter referred to as “the 2024 Tariff Regulations”) for Asset-I: New EMS/SCADA at SLDCs of UPPTCL, RRVPNL, DTL, HVPNL, BBMB, PSPTCL, HPSEBL and J&K PDD and Asset-II: New EMS/SCADA at SLDCs of UPPTCL and J&K PDD” (hereinafter referred to as “the transmission assets”) under “Expansion and Replacement of the existing SCADA/EMS System at SLDC’s of the Northern Region (NRULDC Phase-II)”.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related