CERC: Petition for Seeking Approval of Additional Capital Expenditure for Implementation of EPR Solution in DVC

CERC: Petition for Seeking Approval of Additional Capital Expenditure for Implementation of EPR Solution in DVC Read more

Renewable Energy Projects facing up to 12-month delay in signing of PPAs

Renewable Energy Projects facing up to 12-month delay in signing of PPAs Read more

NHPC float tender for intends to procure Hybrid Power for Supply of 1200MW ISTS connected Wind-Solar Hybrid Projects

NHPC float tender for intends to procure Hybrid Power for Supply of 1200MW ISTS connected Wind-Solar Hybrid Projects Read more

WBERC: Approval of deviations from the Model Bidding Documents for procurement of up to 200 MW RTC thermal power

WBERC: Approval of deviations from the Model Bidding Documents for procurement of up to 200 MW RTC thermal power Read more

India's Solar Energy agency changes bidding policy after Adani bribery allegations

India's Solar Energy agency changes bidding policy after Adani bribery allegations Read more

CERC RoP: Petition for Adoption of Tariff for Long Term Procurement of Solar Power of 300 MW for meeting RPO

CERC RoP: Petition for Adoption of Tariff for Long Term Procurement of Solar Power of 300 MW for meeting RPO Read more

WBERC: CESC Limited has submitted a Petition seeking approval of deviations from the Model Bidding Document

WBERC: CESC Limited has submitted a Petition seeking approval of deviations from the Model Bidding Document Read more

NHPC's Tender Auction Results for 1200 MW FDRE from ISTS-Connected RE Projects+ ESS in India (NHPC-Tranche-VI)

NHPC's Tender Auction Results for 1200 MW FDRE from ISTS-Connected RE Projects+ ESS in India (NHPC-Tranche-VI) Read more

Amendment to ALMM Order for Implementation of ALMM for Solar PV cells

Amendment to ALMM Order for Implementation of ALMM for Solar PV cells Read more

SECI's Tender Auction Results 2000 MW ISTS-connected Solar PV Power Projects with 1000 MW/4000 MWh ESS

SECI's Tender Auction Results 2000 MW ISTS-connected Solar PV Power Projects with 1000 MW/4000 MWh ESS Read more

WBERC: Revisiting orders APR(R)-1/12-13 AND APR(R)-4/13-14 passed against review petitions submitted by the WBSETCL

WBERC: Revisiting orders APR(R)-1/12-13 AND APR(R)-4/13-14 passed against review petitions submitted by the WBSETCL Read more

WBERC: Petition for review of the tariff order of the Durgapur Projects Limited for the year 2023-24, 2024-25, 2025-26

WBERC: Petition for review of the tariff order of the Durgapur Projects Limited for the year 2023-24, 2024-25, 2025-26 Read more

WBERC: Application submitted by WBSEDCL for approval of FPPCA and APR 2022-23

WBERC: Application submitted by WBSEDCL for approval of FPPCA and APR 2022-23 Read more

Imports of Textured Tempered Coated and Uncoated Solar Glass from China and Vietnam

Imports of Textured Tempered Coated and Uncoated Solar Glass from China and Vietnam Read more

WBERC: Petition submitted by IPCL for infrastructural development at Kalyaneswari and its adjoining area

WBERC: Petition submitted by IPCL for infrastructural development at Kalyaneswari and its adjoining area Read more

SJVN invites Tender Bid for Selection of RE Power Developers For Supply of 1500MW/6000MWh ESS in across India Under TBCB

SJVN invites Tender Bid for Selection of RE Power Developers For Supply of 1500MW/6000MWh ESS in across India Under TBCB Read more

CERC: Petition for Grant of Transmission Licence by Khavda IV C Power Transmission Limited.

CERC: Petition for Grant of Transmission Licence by Khavda IV C Power Transmission Limited. Read more

Monthly Coal Statistics Report for the Month of Nov'2024

Monthly Coal Statistics Report for the Month of Nov'2024 Read more

CERC RoP: Petition for Seeking Review of the order dated 8.2.2023 passed in Petition No. 255/TT/2021 by WBSETCL

CERC RoP: Petition for Seeking Review of the order dated 8.2.2023 passed in Petition No. 255/TT/2021 by WBSETCL Read more

Aptel Order for NTPC Vs CERC, APL NO 86 OF 2012 & IA NO 421 OF 2024, Additional capitalization at the Farakka STPS

Aptel Order for NTPC Vs CERC, APL NO 86 OF 2012 & IA NO 421 OF 2024, Additional capitalization at the Farakka STPS Read more

CERC RoP: Petition for Declaring Commercial Operation Date of Tubed Coal Mines and Approval of Input Price of Coal

CERC RoP: Petition for Declaring Commercial Operation Date of Tubed Coal Mines and Approval of Input Price of Coal Read more

Revised ALMM List-I for Solar PV Modules

Revised ALMM List-I for Solar PV Modules Read more

SECI Issues Tender for Selection of Solar Project Developers for setting up of 2112 kW Grid-Connected Rooftop Solar PV

SECI Issues Tender for Selection of Solar Project Developers for setting up of 2112 kW Grid-Connected Rooftop Solar PV Read more

CERC RoP: Petition of Deviation Settlement Mechanism with the CERC Regulations till 2018.

CERC RoP: Petition of Deviation Settlement Mechanism with the CERC Regulations till 2018. Read more

CERC: Petition for action against the WBSEDCL, principal and delayed Late Payment Surcharge, DVC

CERC: Petition for action against the WBSEDCL, principal and delayed Late Payment Surcharge, DVC Read more

WBERC: Notice Inviting Comments / Suggestions/ Objections on Draft WBERC (Fees) (Amendment) Regulations, 2024

WBERC: Notice Inviting Comments / Suggestions/ Objections on Draft WBERC (Fees) (Amendment) Regulations, 2024 Read more

GUVNL's Tender Auction Results for Standalone 500 MW/1000MWh BESS Phase-IV discovers a new L1 for BESS Projects in India

GUVNL's Tender Auction Results for Standalone 500 MW/1000MWh BESS Phase-IV discovers a new L1 for BESS Projects in India Read more

SECI Issues a Tender for Setting up 4.125 MW Grid-Connected Solar PV Projects in IIT Kharagpur Campus under RESCO Mode

SECI Issues a Tender for Setting up 4.125 MW Grid-Connected Solar PV Projects in IIT Kharagpur Campus under RESCO Mode Read more

CERC RoP: Petition for establishment of 400 KV D/C transmission Line in Sikkim Power Transmission Limited

CERC RoP: Petition for establishment of 400 KV D/C transmission Line in Sikkim Power Transmission Limited Read more

CERC: Petition No. 298/MP/2018 was filed by the DVC seeking a declaration that the Respondent, WBSEDCL

CERC: Petition No. 298/MP/2018 was filed by the DVC seeking a declaration that the Respondent, WBSEDCL Read more

CERC: Petition for determination of tariff of Muzaffarpur Thermal Power Station, Stage-II (390 MW) for period 2019-24

CERC: Petition for determination of tariff of Muzaffarpur Thermal Power Station, Stage-II (390 MW) for period 2019-24 Read more

CERC: Petition for grant of an inter-State Category-V trading licence. Avaada Power Trading Private Limited

CERC: Petition for grant of an inter-State Category-V trading licence. Avaada Power Trading Private Limited Read more

CERC RoPs: Petition for compliance of the order dated 12.1.2023 in Petition No. 221/MP/2021, Maithon Power Limit

CERC RoPs: Petition for compliance of the order dated 12.1.2023 in Petition No. 221/MP/2021, Maithon Power Limit Read more

CERC RoPs: adjudication of disputes between the DVC and the PSPCL and for directions

CERC RoPs: adjudication of disputes between the DVC and the PSPCL and for directions Read more

Additional Agenda Item for the meeting of the Standing Linkage Committee (Long-Term) for Power Sector- SLC/LT No. 7/202

Additional Agenda Item for the meeting of the Standing Linkage Committee (Long-Term) for Power Sector- SLC/LT No. 7/202 Read more

CERC RoPs: Petition for determination of tariff on installation of various Emission Control Systems in MTPS Units, DVC

CERC RoPs: Petition for determination of tariff on installation of various Emission Control Systems in MTPS Units, DVC Read more

CERC RoPs: Review Petition under section 94 (1) of the Electricity Act, 2003 read with Regulation 17 of The CERC

CERC RoPs: Review Petition under section 94 (1) of the Electricity Act, 2003 read with Regulation 17 of The CERC Read more

WBERC: WBSEDCL submitted a petition seeking approval of the deviations from the Model Request for Proposal & Model Power

WBERC: WBSEDCL submitted a petition seeking approval of the deviations from the Model Request for Proposal & Model Power Read more

WBERC: M/s Dalmia Cement (Bharat) Ltd. filed a petition before WBERC seeking WBSEDCL from levying from wheeling charge

WBERC: M/s Dalmia Cement (Bharat) Ltd. filed a petition before WBERC seeking WBSEDCL from levying from wheeling charge Read more

Draft CERC (Recruitment, Control and Service conditions of Staff) (7th Amendment) Regulations, 2024

Draft CERC (Recruitment, Control and Service conditions of Staff) (7th Amendment) Regulations, 2024 Read more

CERC RoP: Petition for approval of transmission tariff for new T&D Elements Burdwan GIS

CERC RoP: Petition for approval of transmission tariff for new T&D Elements Burdwan GIS Read more

WBSEDCL seeking approval for a Supplementary Agreement dated 28.03.2024 to the PPA

WBSEDCL seeking approval for a Supplementary Agreement dated 28.03.2024 to the PPA Read more

WBERC: WBSETCL seeking review of operation and maintenance norms as specified in WBERC (Terms and condition of tariff)

WBERC: WBSETCL seeking review of operation and maintenance norms as specified in WBERC (Terms and condition of tariff) Read more

CERC RoP: Petition for adoption of tariff for the 300 MW Grid-connected Solar Power PV Project

CERC RoP: Petition for adoption of tariff for the 300 MW Grid-connected Solar Power PV Project Read more

Aptel interim order directing stay of payment of arrears, UltraTech Cement Limited Vs WBERC

Aptel interim order directing stay of payment of arrears, UltraTech Cement Limited Vs WBERC Read more

Coal Stock Update(as on 16/11/2024): Daily Coal Stock status of TPP with Coal Linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 16/11/2024): Daily Coal Stock status of TPP with Coal Linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 15/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 15/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 14/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 14/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 13/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 13/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 12/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 12/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 11/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 11/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 10/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 10/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 09/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 09/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

CESC filed petition before WBERC, for in-principal approval for incurring the capital expenditure for Unit 3 of 3x250 MW

CESC filed petition before WBERC, for in-principal approval for incurring the capital expenditure for Unit 3 of 3x250 MW Read more

IPCL filed a petition before WBERC for review of annual performance review order for IPCL for financial year 2014 - 15

IPCL filed a petition before WBERC for review of annual performance review order for IPCL for financial year 2014 - 15 Read more

Coal Stock Update(as on 08/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 08/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 07/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 07/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 06/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 06/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 05/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 05/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 04/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 04/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

CERC RoP: Petition for quashing/setting aside of the letters dated 15.07.2024 issued by the CTUIL

CERC RoP: Petition for quashing/setting aside of the letters dated 15.07.2024 issued by the CTUIL Read more

CEA: National Electricity Plan Volume II – Transmission October 2024

CEA: National Electricity Plan Volume II – Transmission October 2024 Read more

CERC Proposes New Regulations for Carbon Credit Trading

CERC Proposes New Regulations for Carbon Credit Trading Read more

SECI float tender for the Manufacturing, Testing, Packing and Forwarding, Supply and Transportation of 400 MWp

SECI float tender for the Manufacturing, Testing, Packing and Forwarding, Supply and Transportation of 400 MWp Read more

CERC RoPs: Petition for seeking quashing/setting aside of the letters dated 15.07.2024 issued by the CTUIL

CERC RoPs: Petition for seeking quashing/setting aside of the letters dated 15.07.2024 issued by the CTUIL Read more

CERC RoP: Petition for Adoption of tariff for 450 MW Solar PV Power Projects (Tranche XVI) connected to the ISTS

CERC RoP: Petition for Adoption of tariff for 450 MW Solar PV Power Projects (Tranche XVI) connected to the ISTS Read more

CERC RoP: Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for ISTS Solar PV Projects

CERC RoP: Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for ISTS Solar PV Projects Read more

CERC RoPs: Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 900 MW Solar PV Power

CERC RoPs: Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 900 MW Solar PV Power Read more

CERC: Petition for PPA between NVVN and BPDB under back-to-back basis with DVC pursuant to PSA dated 6.9.2018

CERC: Petition for PPA between NVVN and BPDB under back-to-back basis with DVC pursuant to PSA dated 6.9.2018 Read more

CERC RoPs: Petition for determination of tariff of Talcher TPS (460 MW) for the period from 1.4.2019 to 31.3.2024

CERC RoPs: Petition for determination of tariff of Talcher TPS (460 MW) for the period from 1.4.2019 to 31.3.2024 Read more

CERC RoP: Petition for Challenging the levy of Bills of Supply for Bilateral Charges raised by CTUIL, RSPPL

CERC RoP: Petition for Challenging the levy of Bills of Supply for Bilateral Charges raised by CTUIL, RSPPL Read more

CERC RoP: Petition under Section 79 (1)(a), (c)&(f) of the Electricity Act, 2003 read with Regulation 13(8) of the CERC

CERC RoP: Petition under Section 79 (1)(a), (c)&(f) of the Electricity Act, 2003 read with Regulation 13(8) of the CERC Read more

CESC Tender for Setting up of 150 MW ISTS-connected Wind-Solar Hybrid Power Projects in India

CESC Tender for Setting up of 150 MW ISTS-connected Wind-Solar Hybrid Power Projects in India Read more

CERC: RoPs for Petition of TWEL rejecting the issuance of Energy Injection Report & for consequential direction

CERC: RoPs for Petition of TWEL rejecting the issuance of Energy Injection Report & for consequential direction Read more

CERC: RoPs for Petition of DBPL seeking execution of the order dated 30.12.2023 passed by the Commission

CERC: RoPs for Petition of DBPL seeking execution of the order dated 30.12.2023 passed by the Commission Read more

MNRE: Office Memorandum regarding mandatory filling of past data (01.01.2024 onwards) on DCR Verification Portal

MNRE: Office Memorandum regarding mandatory filling of past data (01.01.2024 onwards) on DCR Verification Portal Read more

CERC: Grant of an inter-State Category-I trading licence for ENGlE Energy Marketing India Private Limited

CERC: Grant of an inter-State Category-I trading licence for ENGlE Energy Marketing India Private Limited Read more

CERC: Adoption of the tariff of Wind Solar Hybrid Power Projects (Tranche-VII) connected with ISTS

CERC: Adoption of the tariff of Wind Solar Hybrid Power Projects (Tranche-VII) connected with ISTS Read more

CERC: Sharing of inter-State Transmission Charges and Losses, Fourth Amendment Regulations, 2024

CERC: Sharing of inter-State Transmission Charges and Losses, Fourth Amendment Regulations, 2024 Read more

MNRE: Scheme to support Pilot Projects on New and Innovative production techniques and applications of Green Hydrogen

MNRE: Scheme to support Pilot Projects on New and Innovative production techniques and applications of Green Hydrogen Read more

CERC: RoPs for Petition of WBSETCL for the determination of transmission tariff of the deemed Inter-State transmission

CERC: RoPs for Petition of WBSETCL for the determination of transmission tariff of the deemed Inter-State transmission Read more

CERC: RoPs for Petition of AREHSL for quashing of the 3 Bills/Invoices issued by CTUIL of Rs. 2,62,71,559/-

CERC: RoPs for Petition of AREHSL for quashing of the 3 Bills/Invoices issued by CTUIL of Rs. 2,62,71,559/- Read more

CERC: RoPs for Petition of SECI for adoption of the tariff of 1200 MW Solar PV Power Projects with 600 MW/1200 MWh ESS

CERC: RoPs for Petition of SECI for adoption of the tariff of 1200 MW Solar PV Power Projects with 600 MW/1200 MWh ESS Read more

CERC: Petition of EEMIPL for the grant of an inter-State Category-I trading licence

CERC: Petition of EEMIPL for the grant of an inter-State Category-I trading licence Read more

CERC: Petition of SECI for adoption of tariff for 900 MW Wind Solar Hybrid Power Projects

CERC: Petition of SECI for adoption of tariff for 900 MW Wind Solar Hybrid Power Projects Read more

NTPC's Tender Auction Results for 1200 MW Firm and Dispatchable Power (Assured Peak Power Supply) from ISTS-Connected RE

NTPC's Tender Auction Results for 1200 MW Firm and Dispatchable Power (Assured Peak Power Supply) from ISTS-Connected RE Read more

CERC's Report on Short-Term Power Market in India 2023-24

CERC's Report on Short-Term Power Market in India 2023-24 Read more

India's Open Access Growth: Policy Updates, Market Trends, and Renewable Energy Outlook November Update

India's Open Access Growth: Policy Updates, Market Trends, and Renewable Energy Outlook November Update Read more

CERC RoP: Petition for Adoption of tariff for Long Term Procurement of Solar Power of 300 MW from Grid Connected Project

CERC RoP: Petition for Adoption of tariff for Long Term Procurement of Solar Power of 300 MW from Grid Connected Project Read more

Coal Stock Update(as on 3/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 3/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 2/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 2/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 1/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 1/11/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 31/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 31/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

SJVNL's Tender Auction Results for 1200 MW ISTS-Connected Wind Solar Hybrid Project

SJVNL's Tender Auction Results for 1200 MW ISTS-Connected Wind Solar Hybrid Project Read more

CERC RoPs: Petition for Change in Law event and grant of consequential reliefs thereto

CERC RoPs: Petition for Change in Law event and grant of consequential reliefs thereto Read more

Monthly Coal Statistics Report for the Month of Oct'2024

Monthly Coal Statistics Report for the Month of Oct'2024 Read more

RoPs: Petition for Seeking Working Group Report 2022 as Change in Law Event

RoPs: Petition for Seeking Working Group Report 2022 as Change in Law Event Read more

Petitioner NTPC get approval by CERC for adoption of tariff for supply of 1000 MW ISTS-Connected Wind-Solar Projects

Petitioner NTPC get approval by CERC for adoption of tariff for supply of 1000 MW ISTS-Connected Wind-Solar Projects Read more

CERC for determination of transmission tariff from the COD for Transmission Asset 1x500 MVA , 400/220 kV 3rd ICT, Ranchi

CERC for determination of transmission tariff from the COD for Transmission Asset 1x500 MVA , 400/220 kV 3rd ICT, Ranchi Read more

Coal Stock Update(as on 28/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 28/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 29/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 29/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 30/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 30/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

NTPC Tender's Hybrid Power Generators for Supply of 1200 MW Power from ISTS Connected Wind-Solar Hybrid Power Projects

NTPC Tender's Hybrid Power Generators for Supply of 1200 MW Power from ISTS Connected Wind-Solar Hybrid Power Projects Read more

SECI Tender's RfS for 1200 MW RTC Power from ISTS-Connected RE Power Projects in India (SECI-RTC-IV)

SECI Tender's RfS for 1200 MW RTC Power from ISTS-Connected RE Power Projects in India (SECI-RTC-IV) Read more

Draft Central Electricity Regulatory Commission (Conduct of Business) (First Amendment) Regulations, 2024

Draft Central Electricity Regulatory Commission (Conduct of Business) (First Amendment) Regulations, 2024 Read more

Draft Central Electricity Regulatory Commission (Appointment of Consultants) (Fifth Amendment) Regulations, 2024.

Draft Central Electricity Regulatory Commission (Appointment of Consultants) (Fifth Amendment) Regulations, 2024. Read more

RoPs:Petition for Connectivity in a complex based on the criteria of "project location near to pooling Station"

RoPs:Petition for Connectivity in a complex based on the criteria of "project location near to pooling Station" Read more

Petitioner DVC get disapproval by CERC for Additional capital expenditure for setting up of the Administrative Building

Petitioner DVC get disapproval by CERC for Additional capital expenditure for setting up of the Administrative Building Read more

NTPC REL Invites Bids for RE Power Generators for Supply of 1200 MW Firm and Dispatchable Power from ISTS-Connected RE

NTPC REL Invites Bids for RE Power Generators for Supply of 1200 MW Firm and Dispatchable Power from ISTS-Connected RE Read more

Coal Stock Update(as on 27/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 27/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 26/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 26/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 25/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 25/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

MNRE Unveils Draft Plan for Renewable Energy Integration

MNRE Unveils Draft Plan for Renewable Energy Integration Read more

MNRE release updated list I (Manufactures and Modules of Solar PV Modules) of ALMM for Solar PV Cells Initiative

MNRE release updated list I (Manufactures and Modules of Solar PV Modules) of ALMM for Solar PV Cells Initiative Read more

Ministry of Power Updates TBCB Guidelines for procurement of power for Grid Connected Renewable Energy Projects

Ministry of Power Updates TBCB Guidelines for procurement of power for Grid Connected Renewable Energy Projects Read more

Powerica Limited won 50 MW in SECI’s auction for 500 MW ISTS-connected Wind Projects

Powerica Limited won 50 MW in SECI’s auction for 500 MW ISTS-connected Wind Projects Read more

MoP : Amendment to the Guidelines for TBCB Process for Procurement of Firm and Dispatchable Power from Grid Connected

MoP : Amendment to the Guidelines for TBCB Process for Procurement of Firm and Dispatchable Power from Grid Connected Read more

MoP: Draft Electricity (Late Payment Surcharge and Related Matters) (Amendment) Rules, 2024-Reg.

MoP: Draft Electricity (Late Payment Surcharge and Related Matters) (Amendment) Rules, 2024-Reg. Read more

RoPs: Petition for the payment of outstanding dues for reimbursement of POC charges for the PS to RD

RoPs: Petition for the payment of outstanding dues for reimbursement of POC charges for the PS to RD Read more

RoPs:Petition for seeking to challenge liability of the Petitioner to pay transmission charges due to the waiver of ISTS

RoPs:Petition for seeking to challenge liability of the Petitioner to pay transmission charges due to the waiver of ISTS Read more

Coal Stock Update(as on 24/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 24/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 23/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 23/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 22/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 22/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 21/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 21/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

RoP: Petition for Seeking compliance of the order dated 12.1.2023 in Petition No. 221/ MP/2021.

RoP: Petition for Seeking compliance of the order dated 12.1.2023 in Petition No. 221/ MP/2021. Read more

Petitioner DVC get dis-approval by CERC for Approval of additional capital expenditure for R&A of T&D Network in ER

Petitioner DVC get dis-approval by CERC for Approval of additional capital expenditure for R&A of T&D Network in ER Read more

EESL Tender: Rate Contract for supply of ~1,000MWp DCR compliant crystalline 540Wp & above Solar PV Modules across India

EESL Tender: Rate Contract for supply of ~1,000MWp DCR compliant crystalline 540Wp & above Solar PV Modules across India Read more

NVVN's Auction at Tariff of Rs. 2.37-2.38Lacs/MW/Month for 500MW/1000MWh Standalone BESS with VGF in Two Cycle Operation

NVVN's Auction at Tariff of Rs. 2.37-2.38Lacs/MW/Month for 500MW/1000MWh Standalone BESS with VGF in Two Cycle Operation Read more

Coal Stock Update(as on 20/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 20/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 19/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 19/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 18/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 18/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

NTPC's Tender Auction Results for 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects

NTPC's Tender Auction Results for 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects Read more

New Solar Power Scheme (for Tribal and PVTG Habitations/Villages) under PM JANMAN and PM JUGA

New Solar Power Scheme (for Tribal and PVTG Habitations/Villages) under PM JANMAN and PM JUGA Read more

RoPs: Petition of NHPC to CERC for recoupment of under-recovered Energy to shortfall in energy generation

RoPs: Petition of NHPC to CERC for recoupment of under-recovered Energy to shortfall in energy generation Read more

Coal Stock Update(as on 17/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 17/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 16/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 16/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 15/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 15/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

RoPs: Petition of ACME to CERC seeking extension of time for commissioning of 300 MW Solar Power Project

RoPs: Petition of ACME to CERC seeking extension of time for commissioning of 300 MW Solar Power Project Read more

NTPC Auction Awards 1200 MW Solar Power Contracts

NTPC Auction Awards 1200 MW Solar Power Contracts Read more

Join as Vendors: PM Surya Ghar Awareness Expression of Interest

Join as Vendors: PM Surya Ghar Awareness Expression of Interest Read more

Coal Stock Update(as on 14/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 14/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

RoPs: Petition for Directions in respect of an alleged LTOA of 144 MW granted to PTC in respect of ‘Free Power’

RoPs: Petition for Directions in respect of an alleged LTOA of 144 MW granted to PTC in respect of ‘Free Power’ Read more

RoPs: Petition for Appropriate directions to the CTUIL to accept the RBI’s Letter of Mandate of granting connectivity

RoPs: Petition for Appropriate directions to the CTUIL to accept the RBI’s Letter of Mandate of granting connectivity Read more

Monthly Statistical Report of Coal India Ltd for the Month of Sept'2024

Monthly Statistical Report of Coal India Ltd for the Month of Sept'2024 Read more

Coal Stock Update(as on 13/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 13/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

RoPs: Petition for approval of additional expenditure on R&M of ESP at Mejia Thermal Power Station

RoPs: Petition for approval of additional expenditure on R&M of ESP at Mejia Thermal Power Station Read more

RoPs: Petition for revision of tariff for the period 2014-19 in respect of Farakka Super Thermal Power Station

RoPs: Petition for revision of tariff for the period 2014-19 in respect of Farakka Super Thermal Power Station Read more

Coal Stock Update(as on 12/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 12/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 11/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 11/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 10/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 10/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 09/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 09/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

MNRE: ALMM Order 2019: Updated Solar PV Manufacturers List

MNRE: ALMM Order 2019: Updated Solar PV Manufacturers List Read more

Clarification on Approved Solar Photovoltaic Module Manufacturers 2019

Clarification on Approved Solar Photovoltaic Module Manufacturers 2019 Read more

Coal Stock Update(as on 08/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 08/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Notice inviting comments/suggestions/objections on draft WBERC (Grid interactive rooftop solar PV system for prosumers).

Notice inviting comments/suggestions/objections on draft WBERC (Grid interactive rooftop solar PV system for prosumers). Read more

Monthly Report on Short-term Transactions of Electricity in India for the month of June 2024

Monthly Report on Short-term Transactions of Electricity in India for the month of June 2024 Read more

Powergrid Tender: Supply and Installation of Industrial PC for DR PC application at different Sub-stations

Powergrid Tender: Supply and Installation of Industrial PC for DR PC application at different Sub-stations Read more

Staff Paper on modifications in the GNA Regulations (Last date of submission of comments and suggestions:- 11.11.2024)

Staff Paper on modifications in the GNA Regulations (Last date of submission of comments and suggestions:- 11.11.2024) Read more

Coal Stock Update(as on 05/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 05/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 04/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 04/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 06/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 06/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 07/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 07/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

NHPC Announces Tender for Solar Power Generators For Setting up of 1200 MW ISTS Connected Solar Power Projects

NHPC Announces Tender for Solar Power Generators For Setting up of 1200 MW ISTS Connected Solar Power Projects Read more

MNRE: Operational Guidelines for Implementation of Component “Innovative Projects” under PM-Surya Ghar: Muft Bijili Yoja

MNRE: Operational Guidelines for Implementation of Component “Innovative Projects” under PM-Surya Ghar: Muft Bijili Yoja Read more

MNRE: Operational Guidelines for Implementation of Component “Service Charge” under PM-Surya Ghar: Mult Bijli Yojana

MNRE: Operational Guidelines for Implementation of Component “Service Charge” under PM-Surya Ghar: Mult Bijli Yojana Read more

Meeting of the Standing Linkage Committee (Long-Term) for Power Sector- SLC/LT No. 6/2024

Meeting of the Standing Linkage Committee (Long-Term) for Power Sector- SLC/LT No. 6/2024 Read more

Minutes of the meeting of the Standing Linkage Committee (Long-Term) for Power Sector- SLC/LT No. 06/2024

Minutes of the meeting of the Standing Linkage Committee (Long-Term) for Power Sector- SLC/LT No. 06/2024 Read more

Minutes of the meeting of the Standing Linkage Committee (Long-Term) for Power Sector- SLC/LT No. 05/2024

Minutes of the meeting of the Standing Linkage Committee (Long-Term) for Power Sector- SLC/LT No. 05/2024 Read more

MoP: Guidelines for Installation and Operation of Battery Swapping and Charging Stations

MoP: Guidelines for Installation and Operation of Battery Swapping and Charging Stations Read more

THDC Tender: Invitation of Expression of Interest for DPR of THDCIL's upcoming Pumped Storage Projects in India

THDC Tender: Invitation of Expression of Interest for DPR of THDCIL's upcoming Pumped Storage Projects in India Read more

RoPs: Petition matter of truing up of tariff of Talcher Super Thermal Power Station Stage-I (1000 MW)

RoPs: Petition matter of truing up of tariff of Talcher Super Thermal Power Station Stage-I (1000 MW) Read more

RoPs: Petition Tariff for 10 MW Solar Photo Voltaic Power Project at Koderma Thermal Power Station Koderma, Jharkhand.

RoPs: Petition Tariff for 10 MW Solar Photo Voltaic Power Project at Koderma Thermal Power Station Koderma, Jharkhand. Read more

Suo-Motu Petition involving NLDC and Other RLDCs for Planning for safe, secure, and reliable integrated operation

Suo-Motu Petition involving NLDC and Other RLDCs for Planning for safe, secure, and reliable integrated operation Read more

RoPs: Petition Directions and initiation of appropriate action against the Respondent

RoPs: Petition Directions and initiation of appropriate action against the Respondent Read more

Petitioner DVC, MPPMCL get disapproval by CERC for unilateral surrender of 100MW Power from Durgapur TPS, 400MW Meja TPS

Petitioner DVC, MPPMCL get disapproval by CERC for unilateral surrender of 100MW Power from Durgapur TPS, 400MW Meja TPS Read more

RoPs: Petition by BALCO seeking direction upon Respondents to allow them to convert and continue their old connectivity

RoPs: Petition by BALCO seeking direction upon Respondents to allow them to convert and continue their old connectivity Read more

RoPs: Petition by SECI for adoption of tariff for 900 MW Wind Solar Hybrid Power Projects

RoPs: Petition by SECI for adoption of tariff for 900 MW Wind Solar Hybrid Power Projects Read more

Monthly Coal Statistics Report for the Month of Sept'2024

Monthly Coal Statistics Report for the Month of Sept'2024 Read more

RoPs: Petition for Approval of Tariff for Four new Transmission and Distribution Elements for the 2019-24 Tariff Period

RoPs: Petition for Approval of Tariff for Four new Transmission and Distribution Elements for the 2019-24 Tariff Period Read more

India's Open Access Growth: Policy Updates, Market Trends, and Renewable Energy Outlook October Update

India's Open Access Growth: Policy Updates, Market Trends, and Renewable Energy Outlook October Update Read more

Coal Stock Update(as on 03/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 03/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Monthly Statistical Report of Coal India Ltd for the Month of Aug'2024

Monthly Statistical Report of Coal India Ltd for the Month of Aug'2024 Read more

CERC (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2024

CERC (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2024 Read more

Coal Stock Update(as on 02/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 02/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Public consultation on the amendment to the Non-Regulated Sector (NRS) Linkage Auction Policy, 2016 &2020

Public consultation on the amendment to the Non-Regulated Sector (NRS) Linkage Auction Policy, 2016 &2020 Read more

Union Finance Minister Smt. Nirmala Sitharaman chairs the review meeting of the Regional Rural Banks (RRBs) in New Delhi

Union Finance Minister Smt. Nirmala Sitharaman chairs the review meeting of the Regional Rural Banks (RRBs) in New Delhi Read more

Coal Stock Update(as on 01/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 01/10/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Meeting of the Standing Linkage Committee (Long-Term) for Power Sector- SLC(LT) No. 04/2024

Meeting of the Standing Linkage Committee (Long-Term) for Power Sector- SLC(LT) No. 04/2024 Read more

Meeting of the Standing Linkage Committee (Long-Term) for Power Sector- SLC/LT No. 5/2024

Meeting of the Standing Linkage Committee (Long-Term) for Power Sector- SLC/LT No. 5/2024 Read more

Meeting of the Standing Linkage Committee (Long-Term) for Power Sector- SLC/LT No. 4/2024

Meeting of the Standing Linkage Committee (Long-Term) for Power Sector- SLC/LT No. 4/2024 Read more

Public Hearing on Draft CERC Connectivity and GNA to the inter-State Transmission System 3rd Amendment Regulations, 2024

Public Hearing on Draft CERC Connectivity and GNA to the inter-State Transmission System 3rd Amendment Regulations, 2024 Read more

Coal Stock Update(as on 30/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 30/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Petitioner DMTCL get approval by CERC for 2x500 MVA, 400/220kV Darbhanga SS and Muzaffarpur-Darbhanga 400kV DC Line

Petitioner DMTCL get approval by CERC for 2x500 MVA, 400/220kV Darbhanga SS and Muzaffarpur-Darbhanga 400kV DC Line Read more

Coal Stock Update(as on 29/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 29/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 28/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 28/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 27/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 27/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

SECI Tender Offers for 1000 MW Solar PV Projects in India

SECI Tender Offers for 1000 MW Solar PV Projects in India Read more

SECI Announces 2000 MW/8000 MWh FDRE Tender in India

SECI Announces 2000 MW/8000 MWh FDRE Tender in India Read more

Coal Stock Update(as on 26/09/2024): Daily coal stock status of TPP with coal linkages to Coal India Limited (CIL) and S

Coal Stock Update(as on 26/09/2024): Daily coal stock status of TPP with coal linkages to Coal India Limited (CIL) and S Read more

Coal Stock Update(as on 25/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 25/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 24/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 24/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Minutes of 34th Consultation Meeting for Evolving Transmission Schemes in Eastern Region

Minutes of 34th Consultation Meeting for Evolving Transmission Schemes in Eastern Region Read more

Draft calculation sheet for the report of the Committee for calculation of reduction of Right-Of-Way (ROW) width

Draft calculation sheet for the report of the Committee for calculation of reduction of Right-Of-Way (ROW) width Read more

Extension Notice - Call for Proposal of NGHM Testing Scheme

Extension Notice - Call for Proposal of NGHM Testing Scheme Read more

Adoption of tariff of 1500 MW Solar Power Projects connected to the ISTS & selected through Competitive Bidding Process

Adoption of tariff of 1500 MW Solar Power Projects connected to the ISTS & selected through Competitive Bidding Process Read more

Review of order dated 29.01.2018 passed in Petition No. 168/MP/2017

Review of order dated 29.01.2018 passed in Petition No. 168/MP/2017 Read more

Coal Stock Update(as on 23/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 23/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 22/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 22/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 21/09/2024): Daily coal stock status of TPP with coal linkages to CILand SCCL, as per the CEA

Coal Stock Update(as on 21/09/2024): Daily coal stock status of TPP with coal linkages to CILand SCCL, as per the CEA Read more

Coal Stock Update(as on 20/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 20/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 19/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 19/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 18/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 18/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 17/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 17/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 16/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 16/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 15/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 15/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 14/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 14/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Corrigendum to the order dated 2.8.2024 in Petition No. 649/TT/2020

Corrigendum to the order dated 2.8.2024 in Petition No. 649/TT/2020 Read more

Coal Stock Update(as on 13/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 13/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 11/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 11/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2024 – Extension thereof

Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2024 – Extension thereof Read more

Coal Stock Update(as on 10/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 10/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Draft Guidelines for Implementation of the “Payment Security Mechanism” Component and “Central Financial Assistance”

Draft Guidelines for Implementation of the “Payment Security Mechanism” Component and “Central Financial Assistance” Read more

Draft Green Hydrogen Certification Scheme of India for Stakeholder Comments

Draft Green Hydrogen Certification Scheme of India for Stakeholder Comments Read more

Coal Stock Update(as on 09/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 09/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Draft Amendment to ALMM Order for Implementation of ALMM for Solar PV cells

Draft Amendment to ALMM Order for Implementation of ALMM for Solar PV cells Read more

Coal Stock Update(as on 8/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 8/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 7/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 7/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

National Framework for Promoting Energy Storage Systems by Ministry of Power - August 2023

National Framework for Promoting Energy Storage Systems by Ministry of Power - August 2023 Read more

Coal Stock Update(as on 6/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 6/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Determination of Tariff For Distribution & Retail Supply of Electricity in Damodar Valley Area

Determination of Tariff For Distribution & Retail Supply of Electricity in Damodar Valley Area Read more

Adoption of usage charges for 1000 MW Solar PV Power Stations connected to the ISTS - Scheme Phase-II (Tranche-III)

Adoption of usage charges for 1000 MW Solar PV Power Stations connected to the ISTS - Scheme Phase-II (Tranche-III) Read more

Draft Central Electricity Regulatory Commission (Conduct of Business) (First Amendment) Regulations, 2024

Draft Central Electricity Regulatory Commission (Conduct of Business) (First Amendment) Regulations, 2024 Read more

Coal Stock Update(as on 3/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 3/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Grant of licence for inter-state trading licence to Revayu Systems Private Limited

Grant of licence for inter-state trading licence to Revayu Systems Private Limited Read more

Advisory for proactive and comprehensive monitoring of Transmission Lines to Ensure Safety

Advisory for proactive and comprehensive monitoring of Transmission Lines to Ensure Safety Read more

Coal Stock Update(as on 1/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 1/09/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 29/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 29/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Updated (28.08.2024) List-I under ALMM order for Solar PV Modules

Updated (28.08.2024) List-I under ALMM order for Solar PV Modules Read more

Grant of an inter-state trading license to Juniper Green Power Trading Private Limited

Grant of an inter-state trading license to Juniper Green Power Trading Private Limited Read more

Amendment to the Non-Regulated Sector (NRS) Linkage Auction Policy, 2016 & 2020

Amendment to the Non-Regulated Sector (NRS) Linkage Auction Policy, 2016 & 2020 Read more

Clarification to the ‘Guidelines for Development of Onshore Wind Power Projects’ and amendments

Clarification to the ‘Guidelines for Development of Onshore Wind Power Projects’ and amendments Read more

Draft Tariff Based Competitive Bidding Guidelines for Procurement of Storage Capacity/Stored Energy from Pumped Storage

Draft Tariff Based Competitive Bidding Guidelines for Procurement of Storage Capacity/Stored Energy from Pumped Storage Read more

CFP for “Funding of testing facilities, etc. for development of framework under Green H2 National Mission

CFP for “Funding of testing facilities, etc. for development of framework under Green H2 National Mission Read more

Extension of last date for submitting suggestions / comments on Amendment-I to the CEA, Manual on Transmission Planning

Extension of last date for submitting suggestions / comments on Amendment-I to the CEA, Manual on Transmission Planning Read more

Central Electricity Authority (Cyber Security in Power Sector) Regulations, 2024

Central Electricity Authority (Cyber Security in Power Sector) Regulations, 2024 Read more

Amendment-II to the Procedure for approval and facilitating Import/Export (Cross Border) of Electricity

Amendment-II to the Procedure for approval and facilitating Import/Export (Cross Border) of Electricity Read more

Minutes of the matter referred by CERC in the Petition No. 132/MP/2024 – RIL vs. CTUIL and Ors.

Minutes of the matter referred by CERC in the Petition No. 132/MP/2024 – RIL vs. CTUIL and Ors. Read more

Minutes of the Meeting taken by Chairperson, CEA, to discuss the pending applications of Wind Power Plants

Minutes of the Meeting taken by Chairperson, CEA, to discuss the pending applications of Wind Power Plants Read more

Terms and Conditions of Tariff (First Amendment) Regulations, 2024

Terms and Conditions of Tariff (First Amendment) Regulations, 2024 Read more

Directions by the Commission to the Power Exchanges in accordance with Regulation 27(1) of the Power Market Regulations

Directions by the Commission to the Power Exchanges in accordance with Regulation 27(1) of the Power Market Regulations Read more

Review of the Commission’s common order dated 29.3.2023 in Petition Nos.197/GT/ 2017 and 364/GT/2020 and 3/GT/2021

Review of the Commission’s common order dated 29.3.2023 in Petition Nos.197/GT/ 2017 and 364/GT/2020 and 3/GT/2021 Read more

Amendment in Guidelines for Import/Export (Cross Border) of Electricity, 2018

Amendment in Guidelines for Import/Export (Cross Border) of Electricity, 2018 Read more

Continuation of Issuance of Concessional Custom Duty Certificates (CCDCs) for Bio-Gas (BioCNG) using Non-Conv. Method

Continuation of Issuance of Concessional Custom Duty Certificates (CCDCs) for Bio-Gas (BioCNG) using Non-Conv. Method Read more

Review Petition seeking review of the Commission’s common order dated 29.3.2023 in Petition Nos.197/GT/ 2017

Review Petition seeking review of the Commission’s common order dated 29.3.2023 in Petition Nos.197/GT/ 2017 Read more

Directions to the Power Exchanges in accordance with Regulation 27(1) of the Power Market Regulations, 2021

Directions to the Power Exchanges in accordance with Regulation 27(1) of the Power Market Regulations, 2021 Read more

For Implementation of Component ‘Model Solar Village’ under PM-Surya Ghar: Muft Bijli Yojana

For Implementation of Component ‘Model Solar Village’ under PM-Surya Ghar: Muft Bijli Yojana Read more

Deviation Settlement Mechanism and Related Matters Regulations, 2024

Deviation Settlement Mechanism and Related Matters Regulations, 2024 Read more

Coal Stock Update(as on 08/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 08/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Approved Models and Manufacturers of Solar Photovoltaic Modules (Requirement for Compulsory Registration) Order, 2019

Approved Models and Manufacturers of Solar Photovoltaic Modules (Requirement for Compulsory Registration) Order, 2019 Read more

Adoption of Tariff discovered through Competitive Bidding Process for selection of wind power developers

Adoption of Tariff discovered through Competitive Bidding Process for selection of wind power developers Read more

Coal Stock Update(as on 06/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 06/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 02/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 02/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 04/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 04/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Tariff for procurement of 1200 MW power from ISTS-Connected Solar PV Power Projects

Tariff for procurement of 1200 MW power from ISTS-Connected Solar PV Power Projects Read more

Tariff for supply of 1500 MW Firm and Dispatchable Power from ISTS - Connected Renewable Energy (RE) Power Projects

Tariff for supply of 1500 MW Firm and Dispatchable Power from ISTS - Connected Renewable Energy (RE) Power Projects Read more

Grant of an inter-state trading license to Fusionx Asia Pacific Private Limited

Grant of an inter-state trading license to Fusionx Asia Pacific Private Limited Read more

Grant of an inter-state trading license to Juniper Green Power Trading Private Limited

Grant of an inter-state trading license to Juniper Green Power Trading Private Limited Read more

Determination of the levellised generic tariff for the first year of the control period from Renewable Energy Sources

Determination of the levellised generic tariff for the first year of the control period from Renewable Energy Sources Read more

Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2024

Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2024 Read more

Coal Stock Update(as on 05/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 05/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 01/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 01/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Coal Stock Update(as on 03/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA

Coal Stock Update(as on 03/08/2024): Daily coal stock status of TPP with coal linkages to CIL and SCCL, as per the CEA Read more

Ministry of Power (Advisory): To all GENCOs including IPPs for timely import of coal for blending purposes

Ministry of Power (Advisory): To all GENCOs including IPPs for timely import of coal for blending purposes Read more

KPS1 Transmission Limited seeks a licence to inject over 3 GW of renewable energy at Khavda PS1

KPS1 Transmission Limited seeks a licence to inject over 3 GW of renewable energy at Khavda PS1 Read more

MoP: Clarification to Revised Policy for Biomass Utilization for Power Generation through Co-firing in Coal based Power

MoP: Clarification to Revised Policy for Biomass Utilization for Power Generation through Co-firing in Coal based Power Read more

RfS for 500 MW Firm and Dispatchable Power from ISTS-connected Renewable Energy (RE) Power Projects (SECI-FDRE-I)

RfS for 500 MW Firm and Dispatchable Power from ISTS-connected Renewable Energy (RE) Power Projects (SECI-FDRE-I) Read more

Indian Railways Not a Deemed Distribution Licensee - Unpacking the APTEL Judgement

Indian Railways Not a Deemed Distribution Licensee - Unpacking the APTEL Judgement Read more

MoP : Operational Guidelines for Scheme for Viability Gap Funding for development of Battery Energy Storage Systems

MoP : Operational Guidelines for Scheme for Viability Gap Funding for development of Battery Energy Storage Systems Read more

MOP: Central Government introduces the Electricity (Rights of Consumers) Amendment Rules, 2024

MOP: Central Government introduces the Electricity (Rights of Consumers) Amendment Rules, 2024 Read more

MNRE: Amendment to the Guidelines for TBCB Process for Procurement Power from Grid Connected Wind Solar Power Projects

MNRE: Amendment to the Guidelines for TBCB Process for Procurement Power from Grid Connected Wind Solar Power Projects Read more

MNRE: Amendment to the Guidelines for TBCB Process for Procurement Power from Grid Connected Solar PV Power Projects

MNRE: Amendment to the Guidelines for TBCB Process for Procurement Power from Grid Connected Solar PV Power Projects Read more

MNRE: Amendment to the Guidelines for TBCB Process for Procurement Power from Grid Connected Wind Power Projects

MNRE: Amendment to the Guidelines for TBCB Process for Procurement Power from Grid Connected Wind Power Projects Read more

New Solar Power Scheme (for PVTG Habitation / Villages) under PM JANMAN - 04 January 2024

New Solar Power Scheme (for PVTG Habitation / Villages) under PM JANMAN - 04 January 2024 Read more

MNRE: Amendment to the Guidelines for TBCB Process for Procurement of FDRE from Grid Connected RE Projects with ESS

MNRE: Amendment to the Guidelines for TBCB Process for Procurement of FDRE from Grid Connected RE Projects with ESS Read more

MNRE Issues National Repowering & Life Extension Policy For Wind Power Projects on December 7, 2023

MNRE Issues National Repowering & Life Extension Policy For Wind Power Projects on December 7, 2023 Read more

MoM of Forum of Regulators for Model Staff Regulations 14th June 2023

MoM of Forum of Regulators for Model Staff Regulations 14th June 2023 Read more

MNRE: Administrative Approval and Scheme Guidelines for implementation of Waste to Energy Programme under the Umbrella scheme of National Bioenergy Programme for the duration of FY 2021-22 to FY 2025-26

MNRE: Administrative Approval and Scheme Guidelines for implementation of Waste to Energy Programme under the Umbrella scheme of National Bioenergy Programme for the duration of FY 2021-22 to FY 2025-26 Read more