• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
All Tags

CERC RoPs: Petition for revision of tariff of Talcher SSTPS, Stage-II (2000 MW); NTPC vs APEDCL

CERC RoPs: Petition for revision of tariff of Talcher SSTPS, Stage-II (2000 MW); NTPC vs APEDCL Read more

RoP: Petition for Approval of Tariff of Barh Super Thermal Power Station Stage-II (1320 MW) for the period 2019-24.

RoP: Petition for Approval of Tariff of Barh Super Thermal Power Station Stage-II (1320 MW) for the period 2019-24. Read more