• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
All Tags

CERC: Approval for Truing Up 2019-24 and Determination 2024-29 Bhutan HEPs Transmission System in ER

CERC: Approval for Truing Up 2019-24 and Determination 2024-29 Bhutan HEPs Transmission System in ER Read more

CERC RoP: Determination of transmission tariff from the actual COD to 31.3.2024 for Asset-1: 765 kV Spare (1-ph) Reactor

CERC RoP: Determination of transmission tariff from the actual COD to 31.3.2024 for Asset-1: 765 kV Spare (1-ph) Reactor Read more