UPERC public notice for petition for amendment of Transmission License No. 1 of 2013 granted by the commission

UPERC public notice for petition for amendment of Transmission License No. 1 of 2013 granted by the commission Read more

UPERC Notice for petition of Bansal Wire Ind. Pvt Ltd. v/s UPSLDC to allow to purchase REC certificate

UPERC Notice for petition of Bansal Wire Ind. Pvt Ltd. v/s UPSLDC to allow to purchase REC certificate Read more

UPERC Notice for petition of Bansal Wire Ind. Pvt Ltd. v/s UPSLDC to remove deficiency of RPO for FY 2021-22 & 2022-23

UPERC Notice for petition of Bansal Wire Ind. Pvt Ltd. v/s UPSLDC to remove deficiency of RPO for FY 2021-22 & 2022-23 Read more

Aptel Order for APL No. 480 OF 2024, UPPCL vs UPERC, monthly charges payable

Aptel Order for APL No. 480 OF 2024, UPPCL vs UPERC, monthly charges payable Read more

UPERC Notice for petition of Balaji Wire Pvt Ltd. v/s UPSLDC to remove deficiency of RPO for FY 2021-22 & 2022-23

UPERC Notice for petition of Balaji Wire Pvt Ltd. v/s UPSLDC to remove deficiency of RPO for FY 2021-22 & 2022-23 Read more

UPERC Notice for petition of Bansal High Carbon Pvt Ltd. v/s UPSLDC to remove deficiency of RPO for FY 2021-22 & 2022-23

UPERC Notice for petition of Bansal High Carbon Pvt Ltd. v/s UPSLDC to remove deficiency of RPO for FY 2021-22 & 2022-23 Read more

UPERC public notice for petition of project developer and UPNEDA for approval of PPA and SPPA and adoption of tariff

UPERC public notice for petition of project developer and UPNEDA for approval of PPA and SPPA and adoption of tariff Read more

UPERC: Petition of Meerut Shamli Power Transmission Ltd v/s REC Power & others for adoption of Transmission Charges

UPERC: Petition of Meerut Shamli Power Transmission Ltd v/s REC Power & others for adoption of Transmission Charges Read more

UPERC: Petition of Jewar Transmission v/s REC Power & others for adoption of Transmission Charges with respect to System

UPERC: Petition of Jewar Transmission v/s REC Power & others for adoption of Transmission Charges with respect to System Read more

UPERC: Petition of Tirwa Transmission v/s REC Power & others for adoption of Transmission Charges with respect to System

UPERC: Petition of Tirwa Transmission v/s REC Power & others for adoption of Transmission Charges with respect to System Read more

UPERC Notice for petition of Dhariwal Infrastructure Ltd. v/s NPCL for approval of additional expenditure incurred

UPERC Notice for petition of Dhariwal Infrastructure Ltd. v/s NPCL for approval of additional expenditure incurred Read more

UPERC public notice for amendment of Transmission License No. 1 of 2013 granted by commission

UPERC public notice for amendment of Transmission License No. 1 of 2013 granted by commission Read more

UPERC Petition for Determination of Final Tariff and Approval of Capital Cost for Anpara D Thermal Power Plant

UPERC Petition for Determination of Final Tariff and Approval of Capital Cost for Anpara D Thermal Power Plant Read more

UPERC public notice for UPERC Draft (Multi Year Tariff for Distribution) Regulations, 2025 and Conspectus

UPERC public notice for UPERC Draft (Multi Year Tariff for Distribution) Regulations, 2025 and Conspectus Read more

UPERC UPPCL Petition Seeking Approval of Supplementary PPA for 5OMW Solar PV power from Okasa, Uttar Pradesh

UPERC UPPCL Petition Seeking Approval of Supplementary PPA for 5OMW Solar PV power from Okasa, Uttar Pradesh Read more

UPERC Petition under Section 86 of the Electricity Act, 2003, Seeking Payment of Late Payment Surcharge

UPERC Petition under Section 86 of the Electricity Act, 2003, Seeking Payment of Late Payment Surcharge Read more

UPERC Petition Seeking Approval on Peak/Off-Peak Hours for Energy Banking (01.04.2024 onwards)

UPERC Petition Seeking Approval on Peak/Off-Peak Hours for Energy Banking (01.04.2024 onwards) Read more

UPERC Petition Seeking Permission for Grant of Connectivity and Open Access Approval for 10 MW Solar Plant, Bharwara

UPERC Petition Seeking Permission for Grant of Connectivity and Open Access Approval for 10 MW Solar Plant, Bharwara Read more

UPERC Petition Seeking Approval for Creating Charge over Assets and Pledge of Shares

UPERC Petition Seeking Approval for Creating Charge over Assets and Pledge of Shares Read more

UPERC Petition for Relief under Force Majeure and Change in Law for GIS Substations and Associated Lines Construction

UPERC Petition for Relief under Force Majeure and Change in Law for GIS Substations and Associated Lines Construction Read more

UPERC Draft (Terms and Conditions of Generation tariff) Regulation, 2024 for Tariff Period from 1.4.2024 to 31.3.2029

UPERC Draft (Terms and Conditions of Generation tariff) Regulation, 2024 for Tariff Period from 1.4.2024 to 31.3.2029 Read more

UPERC SEUPPTCL Petition Seeking Regulatory Approval For Creating Charge Over Assets And Pledge Of Shares

UPERC SEUPPTCL Petition Seeking Regulatory Approval For Creating Charge Over Assets And Pledge Of Shares Read more

UPERC Petition Seeking Extension of Time for Filling Business Plan and MYT

UPERC Petition Seeking Extension of Time for Filling Business Plan and MYT Read more

UPERC UPPCL Petition Approval for Procurement of 1175 MW Wind Power In Terms of PSA on Long Term Basis Through TBCB

UPERC UPPCL Petition Approval for Procurement of 1175 MW Wind Power In Terms of PSA on Long Term Basis Through TBCB Read more

UPERC Petition Seeking Adoption of Transmission Charges Payable by the Long-Term Transmission Customers

UPERC Petition Seeking Adoption of Transmission Charges Payable by the Long-Term Transmission Customers Read more

UPERC AIPL Petition Seeking Direction(s) to Allow Banking up to 100% of the Energy Generated.

UPERC AIPL Petition Seeking Direction(s) to Allow Banking up to 100% of the Energy Generated. Read more

UPERC Petition Seeking Approval of Terms of Supply of Electricity Inside NCRTC Stations/Premises on Franchisee Basis

UPERC Petition Seeking Approval of Terms of Supply of Electricity Inside NCRTC Stations/Premises on Franchisee Basis Read more

UPERC Petition Application No. 2067/1 of 2024 Reg. Adjudication of Dispute between Shree Cement Limited and UPPCL

UPERC Petition Application No. 2067/1 of 2024 Reg. Adjudication of Dispute between Shree Cement Limited and UPPCL Read more

UPERC Petition In The Matter Of Adoption of Tariffs through TBCB as per MNRE for Procurement of 215 MW Solar Power

UPERC Petition In The Matter Of Adoption of Tariffs through TBCB as per MNRE for Procurement of 215 MW Solar Power Read more

UPERC Petition Seeking Approval of Supplementary PPA for Extension of the term of PPA by 1 year for Supply of Power

UPERC Petition Seeking Approval of Supplementary PPA for Extension of the term of PPA by 1 year for Supply of Power Read more

UPERC Petition Seeking Adoption of Transmission Charges Payable by the Long-Term Transmission Customers

UPERC Petition Seeking Adoption of Transmission Charges Payable by the Long-Term Transmission Customers Read more

UPERC Petition Seeking Relaxation of Regulation 7 regarding Implementation of the RPO Regulatory Fund Order

UPERC Petition Seeking Relaxation of Regulation 7 regarding Implementation of the RPO Regulatory Fund Order Read more

UPERC Petition Seeking Limited Review of the Order dated 16.06.2021 Issued by this Hon’ble Commission

UPERC Petition Seeking Limited Review of the Order dated 16.06.2021 Issued by this Hon’ble Commission Read more

UPERC Petition Seeking Waiver of RPO Backlog till FY 2020-21 due to Impact of COVID19 Pandemic

UPERC Petition Seeking Waiver of RPO Backlog till FY 2020-21 due to Impact of COVID19 Pandemic Read more

UPERC UPNEDA Petition Seeking Amendments in RPO Regulations

UPERC UPNEDA Petition Seeking Amendments in RPO Regulations Read more

UPERC Petition for Prudence Check for Additional Coal Costs due to FSA Grade Coal shortfall in FY 2023-24

UPERC Petition for Prudence Check for Additional Coal Costs due to FSA Grade Coal shortfall in FY 2023-24 Read more

UPERC Petition of UPNEDA Seeking Approval of Bidding Documents for Procurement of Power through TBCB

UPERC Petition of UPNEDA Seeking Approval of Bidding Documents for Procurement of Power through TBCB Read more

UPERC UPSLDC Petition Seeking Directions for Removal of Difficulties Being Faced w.r.t. The Issue of Deemed Availability

UPERC UPSLDC Petition Seeking Directions for Removal of Difficulties Being Faced w.r.t. The Issue of Deemed Availability Read more

UPERC Petition of Bijender Energy and Research vs Pashimanchal Vidyut Vitran Nigam Ltd.

UPERC Petition of Bijender Energy and Research vs Pashimanchal Vidyut Vitran Nigam Ltd. Read more

UPERC MYT Petition for Approval of ARR and determination of Tariff for FY 2019-20 to FY 2023-24 w.r.t. HPPs of UPRVUNL

UPERC MYT Petition for Approval of ARR and determination of Tariff for FY 2019-20 to FY 2023-24 w.r.t. HPPs of UPRVUNL Read more

UPERC: Petition Seeking Approval for the Expenditure on Equipment Installation on account of Change in Law events

UPERC: Petition Seeking Approval for the Expenditure on Equipment Installation on account of Change in Law events Read more

UPERC Petition 2138 for the adoption of Tariff and approval of PPA based Competitive Bidding process

UPERC Petition 2138 for the adoption of Tariff and approval of PPA based Competitive Bidding process Read more

UPERC Petition of NIDP for Adoption of Tariff and Approval of PPA under Competitive Bidding Process

UPERC Petition of NIDP for Adoption of Tariff and Approval of PPA under Competitive Bidding Process Read more

UPERC Petition of NIDP for Adoption of Tariff and Approval of PPA under Competitive Bidding Process

UPERC Petition of NIDP for Adoption of Tariff and Approval of PPA under Competitive Bidding Process Read more

UPERC: Petition 2120 of BWIL for including their Amendments in the UPERC's RPO Regulations, 2010

UPERC: Petition 2120 of BWIL for including their Amendments in the UPERC's RPO Regulations, 2010 Read more

UPERC: Petition of UPPCL for approval of procurement of 1175 MW of Wind Power in terms of the PSA dated 30.05.2024

UPERC: Petition of UPPCL for approval of procurement of 1175 MW of Wind Power in terms of the PSA dated 30.05.2024 Read more

UPERC: Petition of RPSCL Seeking Change in Law event, and consequential grant of in-principle approval

UPERC: Petition of RPSCL Seeking Change in Law event, and consequential grant of in-principle approval Read more

UPERC: Petition of UPPCL Seeking a 'Change in Law' event impacting the costs of the Petitioner and consequential reliefs

UPERC: Petition of UPPCL Seeking a 'Change in Law' event impacting the costs of the Petitioner and consequential reliefs Read more

UPERC: Petition of RSTL for relief under Force Majeure (Article 11) and Change in Law (Article 12) of TSA

UPERC: Petition of RSTL for relief under Force Majeure (Article 11) and Change in Law (Article 12) of TSA Read more

UPERC: Petition of MEIL for reimbursement of expenditure incurred towards transportation of fly ash during FY 2022- 23

UPERC: Petition of MEIL for reimbursement of expenditure incurred towards transportation of fly ash during FY 2022- 23 Read more

UPERC: Petition of DIL seeking approval of the estimated additional Capital Expenditure on De-NOx System

UPERC: Petition of DIL seeking approval of the estimated additional Capital Expenditure on De-NOx System Read more

UPERC: Petition of PPGCL seeking event of Change in Law due to mandatory use of treated sewage water by Thermal Plants

UPERC: Petition of PPGCL seeking event of Change in Law due to mandatory use of treated sewage water by Thermal Plants Read more

UPERC: Petition of NCRTCL seeking approval of Terms of Supply of Electricity Inside its Premises on franchisee Basis

UPERC: Petition of NCRTCL seeking approval of Terms of Supply of Electricity Inside its Premises on franchisee Basis Read more

UPERC: Petition of AIPL for appropriate direction(s) to the Respondents to allow banking up to 100% of the energy gen.

UPERC: Petition of AIPL for appropriate direction(s) to the Respondents to allow banking up to 100% of the energy gen. Read more

UPERC: Petition of UPPCL & 5 others seeking declaration of peak and off-peak hours for the purposes of banked energy

UPERC: Petition of UPPCL & 5 others seeking declaration of peak and off-peak hours for the purposes of banked energy Read more

UPERC: Petition of UPRVUNL for determination of Final Tariff and Approval of Capital Cost for Anpara D Thermal Plant

UPERC: Petition of UPRVUNL for determination of Final Tariff and Approval of Capital Cost for Anpara D Thermal Plant Read more

NPCL Tender: RfS Long Term Procurement of 300 MW Wind Solar Hybrid Power from Grid Connected Projects Under TBCB

NPCL Tender: RfS Long Term Procurement of 300 MW Wind Solar Hybrid Power from Grid Connected Projects Under TBCB Read more

UPERC: Petition of JKPL under Section 14, 15 & 86 (1)(d) of the Electricity Act, 2003 for Grant of Transmission License

UPERC: Petition of JKPL under Section 14, 15 & 86 (1)(d) of the Electricity Act, 2003 for Grant of Transmission License Read more

UPERC: Application of HIL for taking on record the order of APTEL and restoring the proceedings of Petition no. 925/2013

UPERC: Application of HIL for taking on record the order of APTEL and restoring the proceedings of Petition no. 925/2013 Read more

UPERC: Petition of UPPCL & UPNEDA for Adoption of Tariffs Discovered through TBCB for procurement of 215MW Solar Power

UPERC: Petition of UPPCL & UPNEDA for Adoption of Tariffs Discovered through TBCB for procurement of 215MW Solar Power Read more

UPERC: Petition of BHCPL for including their Amendments in the UPERC's Renewable Purchase Obligation Regulations, 2010

UPERC: Petition of BHCPL for including their Amendments in the UPERC's Renewable Purchase Obligation Regulations, 2010 Read more

UPERC: Petition of BWIL for including their Amendments in the UPERC's Renewable Purchase Obligation Regulations, 2010

UPERC: Petition of BWIL for including their Amendments in the UPERC's Renewable Purchase Obligation Regulations, 2010 Read more

UPERC: Petition of BWPL for including their Amendments in UPERC's Renewable Purchase Obligation Regulations, 2010

UPERC: Petition of BWPL for including their Amendments in UPERC's Renewable Purchase Obligation Regulations, 2010 Read more

UPERC: Petition of ARJSPL for appropriate direction to Respondents to allow banking up to 100% of the energy generated

UPERC: Petition of ARJSPL for appropriate direction to Respondents to allow banking up to 100% of the energy generated Read more

UPERC: Petition of Amplus seeking declaration that solar power plants commissioned are entitled for 100% energy banking

UPERC: Petition of Amplus seeking declaration that solar power plants commissioned are entitled for 100% energy banking Read more

UPERC: Petition of ASSPL for appropriate direction to Respondents to allow banking up to 100% of the energy generated

UPERC: Petition of ASSPL for appropriate direction to Respondents to allow banking up to 100% of the energy generated Read more

UPERC: Petition of UPPCL for approval of procurement of 690 MW of Wind Power in terms of the PSA on long term basis

UPERC: Petition of UPPCL for approval of procurement of 690 MW of Wind Power in terms of the PSA on long term basis Read more

UPERC: Petition of UPRVUNL for determination of Final Tariff and Approval of Capital Cost for Anpara D Thermal Plant

UPERC: Petition of UPRVUNL for determination of Final Tariff and Approval of Capital Cost for Anpara D Thermal Plant Read more

UPERC: Petition of BGREPL, NHPL and SHPL for Transfer of Project Sites for Setting up Small Hydro Power Projects

UPERC: Petition of BGREPL, NHPL and SHPL for Transfer of Project Sites for Setting up Small Hydro Power Projects Read more

UPERC: Petition of UPPCL for Approval of SPPA for Hydro Based Power Generation in Matatila & Rihand Hydro Power Stations

UPERC: Petition of UPPCL for Approval of SPPA for Hydro Based Power Generation in Matatila & Rihand Hydro Power Stations Read more

UPERC: Petiton seeking Transmission License for Jewar Transmission Limited

UPERC: Petiton seeking Transmission License for Jewar Transmission Limited Read more

UPERC: Petition of DIL for carrying out prudence check of the cost for procurement and use of Additional Coal

UPERC: Petition of DIL for carrying out prudence check of the cost for procurement and use of Additional Coal Read more

UPERC: Petition of DIL for claiming additional recurring/non- recurring expenditure incurred on account of Change in Law

UPERC: Petition of DIL for claiming additional recurring/non- recurring expenditure incurred on account of Change in Law Read more

UPERC: Petition of JIL Seeking Exemption for Supplied Energy by Respondent or Licensed Electricity Producer/Trader

UPERC: Petition of JIL Seeking Exemption for Supplied Energy by Respondent or Licensed Electricity Producer/Trader Read more

UPERC: Petition seeking Transmission License for Meerut Shamil Power Transmission Limited

UPERC: Petition seeking Transmission License for Meerut Shamil Power Transmission Limited Read more

UPERC: Petition of RPSCL seeking declaration that Clause 6.2(5) of the National Tariff Policy, 2016

UPERC: Petition of RPSCL seeking declaration that Clause 6.2(5) of the National Tariff Policy, 2016 Read more

UPERC: Petition of PPGCL seeking declaration of event of Change in Law due to mandatory use of treated sewage water

UPERC: Petition of PPGCL seeking declaration of event of Change in Law due to mandatory use of treated sewage water Read more

UPERC: Petition of UPNEDA for approval of RfS and DPPA for procurement of Power through TBCB from Grid Connected Solar

UPERC: Petition of UPNEDA for approval of RfS and DPPA for procurement of Power through TBCB from Grid Connected Solar Read more

UPERC: Petition of UPRVUNL for ARR and determination of Tariff for Rihand & Matatila hydroelectric power stations

UPERC: Petition of UPRVUNL for ARR and determination of Tariff for Rihand & Matatila hydroelectric power stations Read more

UPERC: Petition of UPRVUNL for recovery of Additional Expenditure incurred due to ash transportation charges

UPERC: Petition of UPRVUNL for recovery of Additional Expenditure incurred due to ash transportation charges Read more

UPERC: Petition of NPCL for Truing up for FY 2022-23, APR for FY 2023-24, Approval of AAR and Tarif for FY 2024-25

UPERC: Petition of NPCL for Truing up for FY 2022-23, APR for FY 2023-24, Approval of AAR and Tarif for FY 2024-25 Read more

UPERC: Petition of Truing up of tariff for FY 2022-23, APR for FY 2023-24, AAR and Tariff for FY 2024-25

UPERC: Petition of Truing up of tariff for FY 2022-23, APR for FY 2023-24, AAR and Tariff for FY 2024-25 Read more

UPERC: Petition of UPPTCL for Determination of ARR for FY 2024-25, APR for FY 2023-24 and True-up for the FY 2022-23

UPERC: Petition of UPPTCL for Determination of ARR for FY 2024-25, APR for FY 2023-24 and True-up for the FY 2022-23 Read more

UPERC: Petition of UPSLDC for approval of the disbursal of fund for Upgradation of on-site IT data center

UPERC: Petition of UPSLDC for approval of the disbursal of fund for Upgradation of on-site IT data center Read more

UPERC: Petition of UPNEDA for procurement of Power through TBCB Process from Grid Connected Solar Power Plants

UPERC: Petition of UPNEDA for procurement of Power through TBCB Process from Grid Connected Solar Power Plants Read more

UPERC: Petition of UPSLDC seeking Approval of ARR, SLDC Charges (2024-25), APR (2023-24) and True-up (2022-23)

UPERC: Petition of UPSLDC seeking Approval of ARR, SLDC Charges (2024-25), APR (2023-24) and True-up (2022-23) Read more

UPERC: Tirwa transmission Ltd. to publish a public notice following its petition seeking Transmission License

UPERC: Tirwa transmission Ltd. to publish a public notice following its petition seeking Transmission License Read more

Petition of UPPCL gets approved by UPERC for approval of SPPA dated 30.03.2024 for Hydro based power generation

Petition of UPPCL gets approved by UPERC for approval of SPPA dated 30.03.2024 for Hydro based power generation Read more

Petition of UPPCL gets approved by UPERC seeking approval of the long-term PPA and the deviations in approved documents

Petition of UPPCL gets approved by UPERC seeking approval of the long-term PPA and the deviations in approved documents Read more

Petition of UPPCL gets approved by UPERC for procurement of 500MW of Solar power in terms of the PSA dated 28.12.2023

Petition of UPPCL gets approved by UPERC for procurement of 500MW of Solar power in terms of the PSA dated 28.12.2023 Read more

Petition of UPPCL gets approved by UPERC for procurement of 1 GW of Solar power in terms of the PSA dated 07.02.2024

Petition of UPPCL gets approved by UPERC for procurement of 1 GW of Solar power in terms of the PSA dated 07.02.2024 Read more

Petition of UPNEDA & UPPCL gets approved by UPERC for approval of PPA executed between Project Developers and UPPCL

Petition of UPNEDA & UPPCL gets approved by UPERC for approval of PPA executed between Project Developers and UPPCL Read more

Petition of UPPCL gets approved by UPERC seeking approval of the Long Term PPA and the deviations in approved documents

Petition of UPPCL gets approved by UPERC seeking approval of the Long Term PPA and the deviations in approved documents Read more

Petition of UPPCL gets admitted by UPERC for approval of procurement of 690 MW of Wind Power in terms of the PSA

Petition of UPPCL gets admitted by UPERC for approval of procurement of 690 MW of Wind Power in terms of the PSA Read more

UPERC: Petition of UPRVUNL for determination of Final Tariff for Anpara D Thermal power plant

UPERC: Petition of UPRVUNL for determination of Final Tariff for Anpara D Thermal power plant Read more

Petition of UPPCL gets approved by UPERC seeking approval of SPPAs dated 30.03.2024 executed between UPPCL and UPRVUNL

Petition of UPPCL gets approved by UPERC seeking approval of SPPAs dated 30.03.2024 executed between UPPCL and UPRVUNL Read more

Terms and Conditions for Open Access (First Amendment) Regulations, 2024

Terms and Conditions for Open Access (First Amendment) Regulations, 2024 Read more

Uttar Pradesh Solar Energy Policy, 2022

Uttar Pradesh Solar Energy Policy, 2022 Read more