CERC: Petition for Avaada Challenges CTUIL’s Inaction on Solar-Wind Project Connectivity Read more
CERC: Petition for seeking relaxation of the Regulation 11A read with Regulation 5.8 (xi); Tata Power Renewable Energy Read more
CERC: Petition for determination of transmission tariff from the COD to 31.3.2024 for Indore Sub-station, 325 MW Wind Read more
GUVNL's Tender Auction Results for Selection of Wind Power Developer for Supply of 250 MW Grid-connected Wind Projects Read more
NTPC Renewable Issues Tender with Nominal Capacity of 900 MW Wind Energy Project in Andhra Pradesh Read more
NTPC REL Invites Tender Bids for install Wind Turbine Generators for 110 MW ISTS Connected Wind Project at Khavda Read more
CERC RoP: Petition for Development of 75 MW ISTS Connected Wind Project between AWEKSL and MSEDCL seeking reliefs Read more