CERC NLDC for advance procurement and despatch of 150 MW/300 MWh BESS Read more
RVUNL Launches Tender for 500 MW/1000 MWh BESS along with additional Green Shoe option of 500 MW/1000 MWh with VGF Read more
GUVNL files petition before GERC for approval of PPA with GSECL of grid connected 35 MW Solar PV and 57 MWh BESS Read more
RoPs: Petition for Compensation for breach of the MUST RUN status accorded to the Petitioner’s 2x10 MW Solar PV power Read more
RfS Document for setting up of Projects of 200 MW / 1600 MWh Standalone Battery Energy Storage Read more
RoPs: Petition for Adoption of tariff for Pilot Projects of 500 MW/1000MWh Standalone Battery Energy Storage Systems Read more
NTPC-Ramagundam Issues Tender for 100MW/400MWh BESS Read more
Amendment of the existing RTM Transmission Licence to POWERGRID Ramgarh Transmission Limited for interconnection of BESS Read more