Severity: Warning
Message: opendir(/var/lib/lsphp/session/lsphp80): Failed to open directory: Permission denied
Filename: drivers/Session_files_driver.php
Line Number: 365
Backtrace:
File: /home/omnicoreplus.com/public_html/application/controllers/Default_Controler.php
Line: 7
Function: __construct
File: /home/omnicoreplus.com/public_html/index.php
Line: 272
Function: require_once
NTPC issue tender for 2670 MWh BESS Projects at 9 Thermal Power Stations Read more
Aptel Order for APPEAL No. 92 of 2017; NLC vs CERC; NLC Challenges Tariff Revision for TPS-II Read more
UPERC: Petition of UPRVUNL v/s UPPCL for approval of provisional Capital Cost, ARR & tariff of 1X660 MW Panki Ext TPS Read more
Aptel Order for APPEAL No. 95 OF 2020; HEL vs WBERC; Haldia Energy Challenges WBERC Order on Transmission Project Read more
Aptel Order forAPPEAL No. 141 OF 2023; HEL vs WBERC; Appeal Challenging Cost Disallowance in HEL Project Read more
CERC: Petition for approval of tariff of Barauni Thermal Power Station, Stage-I, NTPC Read more
CERC RoPs: Petition for determination of tariff of Talcher TPS (460 MW) for the period from 1.4.2019 to 31.3.2024 Read more