• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
All Tags

CERC: Finalizes Compensation Charge Procedure for Extending GNA Project Milestones

CERC: Finalizes Compensation Charge Procedure for Extending GNA Project Milestones Read more

GERC: Petition of GSP Crop Science v/s GETCO for extension of time period for commissioning the entire evacuation infra

GERC: Petition of GSP Crop Science v/s GETCO for extension of time period for commissioning the entire evacuation infra Read more

GERC: Petition of Sapana Sakar Buildcon v/s GETCO to grant extension of time for commissioning of the Evacuation Line

GERC: Petition of Sapana Sakar Buildcon v/s GETCO to grant extension of time for commissioning of the Evacuation Line Read more

MSERC: Meghalaya State Electricity Regulatory Commission (State Grid Code) (6 of 2026) Regulations, 2026

MSERC: Meghalaya State Electricity Regulatory Commission (State Grid Code) (6 of 2026) Regulations, 2026 Read more

GERC: Petition of Saraca Asoca Renewables v/s GETCO for clarification of Clause 5.7(iv) of Connectivity Procedure 2025

GERC: Petition of Saraca Asoca Renewables v/s GETCO for clarification of Clause 5.7(iv) of Connectivity Procedure 2025 Read more

GERC: Petition of Epipremnum Aureum v/s GETCO for clarification & appropriate modification of Clause 5.7(iv)

GERC: Petition of Epipremnum Aureum v/s GETCO for clarification & appropriate modification of Clause 5.7(iv) Read more

GERC: Petition of Renewgain Pvt Ltd v/s GETCO for directions for quashing the letter dated 18.02.2025

GERC: Petition of Renewgain Pvt Ltd v/s GETCO for directions for quashing the letter dated 18.02.2025 Read more

CERC Petition Seeks BG Delay Condonation for Pace Digitek’s 100 MW Connectivity

CERC Petition Seeks BG Delay Condonation for Pace Digitek’s 100 MW Connectivity Read more

SECI Issues RfS for 1200 MW FDRE Project with Assured Peak Supply of 4,800 MWh Under SECI-FDRE-IX

SECI Issues RfS for 1200 MW FDRE Project with Assured Peak Supply of 4,800 MWh Under SECI-FDRE-IX Read more

GERC: Petition of EGSVEPL to quash& set aside letter dated 16.09.23 issued by GETCO & restore Stage-II Connectivity

GERC: Petition of EGSVEPL to quash& set aside letter dated 16.09.23 issued by GETCO & restore Stage-II Connectivity Read more

GERC: Petition of Bhathwari Tech v/s GETCO for extension of time period for commissioning of Project capacity allocated

GERC: Petition of Bhathwari Tech v/s GETCO for extension of time period for commissioning of Project capacity allocated Read more

CSERC: Petition of Shri Bajrang Power v/s CSPDCL for exemption from dedicated feeder for availing OA for Solar PV Power

CSERC: Petition of Shri Bajrang Power v/s CSPDCL for exemption from dedicated feeder for availing OA for Solar PV Power Read more

HERC: Petition of DHBVNL for allowing power supply connection of 6.25 MVA load at 220 kV level to provide connectivity

HERC: Petition of DHBVNL for allowing power supply connection of 6.25 MVA load at 220 kV level to provide connectivity Read more

CERC: Petition for determination of tariff for Implementation TL at Kurnool SS onnectivity to Greenko AP01 IREP in SR

CERC: Petition for determination of tariff for Implementation TL at Kurnool SS onnectivity to Greenko AP01 IREP in SR Read more

CERC: Petition for determination of transmission tariff of the 2024-29 for connectivity of MBPMPL in WR

CERC: Petition for determination of transmission tariff of the 2024-29 for connectivity of MBPMPL in WR Read more