A PHP Error was encountered

Severity: Warning

Message: opendir(/var/lib/lsphp/session/lsphp80): Failed to open directory: Permission denied

Filename: drivers/Session_files_driver.php

Line Number: 365

Backtrace:

File: /home/omnicoreplus.com/public_html/application/controllers/Default_Controler.php
Line: 7
Function: __construct

File: /home/omnicoreplus.com/public_html/index.php
Line: 272
Function: require_once

Omnicore: Real-Time Regulatory and Policy Updates for India's Energy and Infrastructure Sectors
  • Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
All Tags

NTPC Tender Auction Results for 1200 MW ISTS Connected Solar PV Power Projects with "Greenshoe Option" of up to 600 MW

NTPC Tender Auction Results for 1200 MW ISTS Connected Solar PV Power Projects with "Greenshoe Option" of up to 600 MW Read more