• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
All Tags

CERC RoP: Petition for determination of tariff of Talcher Thermal Power Station (460 MW) for the period from Apr19-Mar24

CERC RoP: Petition for determination of tariff of Talcher Thermal Power Station (460 MW) for the period from Apr19-Mar24 Read more

CERC RoP: Petition for Revision of Tariff for the Period 2014-19 in GRIDCO Ltd

CERC RoP: Petition for Revision of Tariff for the Period 2014-19 in GRIDCO Ltd Read more

CERC RoPs: Petition for determination of tariff of Talcher TPS (460 MW) for the period from 1.4.2019 to 31.3.2024

CERC RoPs: Petition for determination of tariff of Talcher TPS (460 MW) for the period from 1.4.2019 to 31.3.2024 Read more