• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
All Tags

JSERC: Petition of JBVNL v/s Inland Green Energy for approval of draft CPP Agreement for synchronization of 12.5 MW CPP

JSERC: Petition of JBVNL v/s Inland Green Energy for approval of draft CPP Agreement for synchronization of 12.5 MW CPP Read more

Aptel Order for CSPDCL vs CSERC, APL No. 186 OF 2017, Calculate the PoC on the captive and non-captive load

Aptel Order for CSPDCL vs CSERC, APL No. 186 OF 2017, Calculate the PoC on the captive and non-captive load Read more

JSERC: For approval of the draft agreement to be executed for synchronization of (2*10) MW captive power plant

JSERC: For approval of the draft agreement to be executed for synchronization of (2*10) MW captive power plant Read more

Verification of captive status of CPPs through the open access regulation

Verification of captive status of CPPs through the open access regulation Read more